FREE PRIORITY MAIL SHIPPING: on all orders shipped within the U.S. details

FREE RETURNS: prepaid return label included on purchases over $149.99 (contiguous U.S.) details

PRICE MATCH: we will gladly match any US competitor's price within minutes

Marmot Trestles 15F Sleeping Bag Long (Lead / Electric) Image Gallery

return back to standard view...
Marmot Trestles 15 Sleeping Bag Long (Lead / Electric)
return back to standard view...
  • Weight: 3 lbs 14 oz. (1765 g) Size: 6" Temperature: 15 F (-9 C)
  • Insulation: Spirafil 120
  • Classic trapezodial foot box
  • Compression stuff sack
  • "Feely" and hood draw cord
  • Second side zip
  • Wave construction
  • Velcro-free face muff
  • Snagless draft tube
  • Two hang loops

The full-featured Trestles 15 long is a reliable, all-purpose synthetic bag that insulates even in sustained cold and damp conditions while backpacking, trekking and mountaineering.

We have other Marmot products...

More items by Marmot

Your Browsing History

Marmot Trestles 15F Sleeping Bag Long (Lead / Electric)

Shop with confidence at NorwaySports.com: we have been serving outdoor enthusiasts since 1999 and are committed to providing an exceptional customer service. We are customer certified, trusted, or highly rated small and independently-owned online store.

NexTag Seller
BizRate Customer Certified (GOLD) Site
Read Your Store Reviews
PriceGrabber User Ratings for NorwaySports.com

Your shopping cart is currently empty.

Here are some items you looked at:

Marmot Trestles 15F Sleeping Bag Long (Lead / Electric)

Sign-up for our newsletter and GET 10% OFF on your next purchase of any one full-price item*:

*excludes closeouts and sale items, limit one item per customer, in-stock items only, while supplies last, not combinable with other offers

Now accepting PayPal payments
Now accepting Amazon payments
International orders by Bongo

© Copyright 1999–2026 Web Commerce LLC. All rights reserved. CDRO